GENERAL
ADDRESS
75 Rockefeller Plaza
New York, NY 10019
YEAR BUILT
1947- Redeveloped 2017
ARCHITECT
Carson and Lundin Architects
BUILDING AREA
625,000 square feet
RETAIL ESTABLISHMENTS
American Girl
TRANSPORTATION
Conveniently located within nine (9) blocks of Grand
Central Terminal and nine (9) blocks from Times Square
RECENT CAPITAL IMPROVEMENTS
Renovated lobby and main entrance, upgraded elevator
equipment and interiors, fire alarm system, access
control and CCTV system, HVAC system and Building
Management System (BMS)
AMENITIES
24/7 building access, on-site property management,
bike storage, loading dock, messenger center,
internet based tenant work order system and visitor
management system
CONSTRUCTION
HOURS OF OPERATION
Standard hours of HVAC operation are 8 a.m. to 6 p.m.,
Monday through Friday
AIR CONDITIONING
The building is cooled with (2) 800 ton and (1) 400 ton
electrical centrifugal chillers. The cooling for the interior
zone on the low rise floors is provided by (2) 10 ton floor
mounted vav AHU’s while the cooling for the interior
of the high rise floors is provided by (4) 2.5 ton ceiling
mounted constant volume fan coil units. Perimeter is
cooled and heated by 1,698 Train Fan Coil Units. One heat
exchange plate for free cooling
VENTILATION SYSTEMS
A.H.U.’s on the 33rd floor and 9th floor Mezzanine provide
ventilation to the entire building
SUPPLEMENTAL HVAC
Each high rise floor is allotted 15 tons per floor while each
low rise floor is allotted 30 tons per floor. This condenser
water is available 24/7
ELECTRICITY
GENERAL
Each floor is designed to allow (1) 6 or 6.5 watts USF,
exclusive of base building A/C
METHOD OF MEASURING TENANT CONSUMPTION
Tenants are sub-metered by TNE. Costs related to
base building electric consumption are reflected via
operating expenses
ELECTRIC CLOSETS
There are (2) closets on floors 2-9 and (1) closet on floors 10-32
EMERGENCY POWER
1250 kw generator for fire, life safety, elevators
ADDITIONAL POWER
Additional electric can be made available at Tenant’s
expense, subject to Landlord’s review of Tenant’s
requirements